US Bridges

Hyundai Blvd. over Wiley Creek

Good

Montgomery County, Alabama · 2 MI E of U.S. 31 · Structure no. 016239

Built
1994
31 years old, rebuilt 2004
Condition
Good
inspected June 2023
Type
Channel Beam
Concrete
Length
68 ft
2 main spans
Daily traffic
3,000
2004 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hyundai Blvd. over Wiley Creek is a concrete channel beam carrying Hyundai Blvd. over Wiley Creek in Montgomery County, Alabama. It was built in 1994 and reconstructed in 2004, so it is 31 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,000 vehicles a day, roughly 25% of them trucks, projected to reach 3,000 by 2041. The structure is 68 ft (20.8 m) long and 40 ft wide.

CarriesHyundai Blvd.
CrossesWiley Creek
Location2 MI E of U.S. 31
RouteCounty Highway 42
StateAlabama
Coordinates32.27769, -86.31568
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.7 US tons
Inventory rating32.2 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadH 20
Structure length68 ft (20.8 m)
Longest span34 ft (10.4 m)
Deck width40 ft (12.3 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,000 (2004)
Projected traffic3,000 by 2041
Trucks25%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$858,000 (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Hyundai Blvd. over Wiley Creek built?

It was built in 1994, making it 31 years old in 2025. It was reconstructed in 2004.

What condition is Hyundai Blvd. over Wiley Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Hyundai Blvd. over Wiley Creek carry?

About 3,000 vehicles per day (2004 count), of which roughly 25% are trucks.

How long is Hyundai Blvd. over Wiley Creek?

The structure is 68 ft (20.8 m) long with a longest span of 34 ft (10.4 m) and a deck 40 ft wide.

Who owns Hyundai Blvd. over Wiley Creek?

It is owned by the City or Municipal Highway Agency.