US Bridges

Pugh Road over Drainage Ditch

Fair

Montgomery County, Alabama · .4 MI W Old Pike RD · Structure no. 015381

Built
1991
34 years old
Condition
Fair
inspected May 2024
Type
Channel Beam
Concrete
Length
34 ft
1 main span
Daily traffic
30
1988 count
Owner
County
County Highway Agency

About this bridge

Pugh Road over Drainage Ditch is a concrete channel beam carrying Pugh Road over Drainage Ditch in Montgomery County, Alabama. It was built in 1991, so it is 34 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 30 vehicles a day, projected to reach 100 by 2044. The structure is 34 ft (10.4 m) long and 31 ft wide.

CarriesPugh Road
CrossesDrainage Ditch
Location.4 MI W Old Pike RD
RouteCounty Highway 0
StateAlabama
Coordinates32.16157, -86.03214
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.1 US tons
Inventory rating41.6 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length34 ft (10.4 m)
Longest span34 ft (10.4 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (1988)
Projected traffic100 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$387,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Pugh Road over Drainage Ditch built?

It was built in 1991, making it 34 years old in 2025.

What condition is Pugh Road over Drainage Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does Pugh Road over Drainage Ditch carry?

About 30 vehicles per day (1988 count).

How long is Pugh Road over Drainage Ditch?

The structure is 34 ft (10.4 m) long with a longest span of 34 ft (10.4 m) and a deck 31 ft wide.

Who owns Pugh Road over Drainage Ditch?

It is owned by the County Highway Agency.