US Bridges

Woodley Road over Drainage Relief

Good

Montgomery County, Alabama · 8.2 Mi. N Moore Rd. · Structure no. 014847

Built
1989
36 years old
Condition
Good
inspected August 2023
Type
Channel Beam
Concrete
Length
68 ft
2 main spans
Daily traffic
80
1988 count
Owner
County
County Highway Agency

About this bridge

Woodley Road over Drainage Relief is a concrete channel beam carrying Woodley Road over Drainage Relief in Montgomery County, Alabama. It was built in 1989, so it is 36 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 80 vehicles a day, projected to reach 120 by 2041. The structure is 68 ft (20.7 m) long and 27 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesWoodley Road
CrossesDrainage Relief
Location8.2 Mi. N Moore Rd.
RouteCounty Highway 12
StateAlabama
Coordinates32.13531, -86.13606
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating73.5 US tons
Inventory rating44 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length68 ft (20.7 m)
Longest span34 ft (10.4 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (1988)
Projected traffic120 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$557,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Woodley Road over Drainage Relief built?

It was built in 1989, making it 36 years old in 2025.

What condition is Woodley Road over Drainage Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Woodley Road over Drainage Relief carry?

About 80 vehicles per day (1988 count).

How long is Woodley Road over Drainage Relief?

The structure is 68 ft (20.7 m) long with a longest span of 34 ft (10.4 m) and a deck 27 ft wide.

Who owns Woodley Road over Drainage Relief?

It is owned by the County Highway Agency.