I-85 over S Jackson ST
PoorMontgomery County, Alabama · 1.5 MI N of I65 · Structure no. 014469
- Built
- 1969
- 56 years old, rebuilt 1988
- Condition
- Poor
- inspected May 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 169 ft
- 3 main spans
- Daily traffic
- 104,310
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
I-85 over S Jackson ST is a concrete continuous tee beam carrying I-85 over S Jackson ST in Montgomery County, Alabama. It was built in 1969 and reconstructed in 1988, so it is 56 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 104,310 vehicles a day, roughly 10% of them trucks, projected to reach 137,476 by 2033. The structure is 169 ft (51.5 m) long and 159 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-85 over S Jackson ST built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 1988.
What condition is I-85 over S Jackson ST in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in May 2023.
How much traffic does I-85 over S Jackson ST carry?
About 104,310 vehicles per day (2013 count), of which roughly 10% are trucks.
How long is I-85 over S Jackson ST?
The structure is 169 ft (51.5 m) long with a longest span of 64 ft (19.5 m) and a deck 159 ft wide.
Who owns I-85 over S Jackson ST?
It is owned by the State Highway Agency.