Snwdn-Chambers Rd. over Drainage Relief
FairPosted for loadMontgomery County, Alabama · 2.8 Mile East CO RD61 · Structure no. 012994
- Built
- 1983
- 42 years old
- Condition
- Fair
- inspected October 2023
- Type
- Channel Beam
- Concrete
- Length
- 152 ft
- 6 main spans
- Daily traffic
- 400
- 1989 count
- Owner
- County
- County Highway Agency
About this bridge
Snwdn-Chambers Rd. over Drainage Relief is a concrete channel beam carrying Snwdn-Chambers Rd. over Drainage Relief in Montgomery County, Alabama. It was built in 1983, so it is 42 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 400 vehicles a day, roughly 1% of them trucks, projected to reach 600 by 2044. The structure is 152 ft (46.3 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Snwdn-Chambers Rd. over Drainage Relief built?
It was built in 1983, making it 42 years old in 2025.
What condition is Snwdn-Chambers Rd. over Drainage Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Snwdn-Chambers Rd. over Drainage Relief carry?
About 400 vehicles per day (1989 count), of which roughly 1% are trucks.
How long is Snwdn-Chambers Rd. over Drainage Relief?
The structure is 152 ft (46.3 m) long with a longest span of 19 ft (5.8 m) and a deck 28 ft wide.
Who owns Snwdn-Chambers Rd. over Drainage Relief?
It is owned by the County Highway Agency.