US Bridges

Haynevilleridge RD over Drainage Relief

Good

Montgomery County, Alabama · 1.2 MI E US 82 · Structure no. 012177

Built
1979
46 years old
Condition
Good
inspected July 2024
Type
Channel Beam
Concrete
Length
144 ft
6 main spans
Daily traffic
255
1988 count
Owner
County
County Highway Agency

About this bridge

Haynevilleridge RD over Drainage Relief is a concrete channel beam carrying Haynevilleridge RD over Drainage Relief in Montgomery County, Alabama. It was built in 1979, so it is 46 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 255 vehicles a day, roughly 1% of them trucks, projected to reach 190 by 2044. The structure is 144 ft (43.9 m) long and 28 ft wide. If it were closed, the detour would be 19.3 mi (31 km).

CarriesHaynevilleridge RD
CrossesDrainage Relief
Location1.2 MI E US 82
RouteCounty Highway 36
StateAlabama
Coordinates32.18596, -86.07358
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating55.6 US tons
Inventory rating33.3 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans6
Design loadHS 20
Structure length144 ft (43.9 m)
Longest span24 ft (7.3 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic255 (1988)
Projected traffic190 by 2044
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed19.3 mi (31 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.1 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Haynevilleridge RD over Drainage Relief built?

It was built in 1979, making it 46 years old in 2025.

What condition is Haynevilleridge RD over Drainage Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Haynevilleridge RD over Drainage Relief carry?

About 255 vehicles per day (1988 count), of which roughly 1% are trucks.

How long is Haynevilleridge RD over Drainage Relief?

The structure is 144 ft (43.9 m) long with a longest span of 24 ft (7.3 m) and a deck 28 ft wide.

Who owns Haynevilleridge RD over Drainage Relief?

It is owned by the County Highway Agency.