Al 152 Ebl over 6th ST
FairMontgomery County, Alabama · 6th ST Interchange · Structure no. 011500
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 206 ft
- 4 main spans
- Daily traffic
- 12,415
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
Al 152 Ebl over 6th ST is a steel stringer/multi-beam or girder carrying Al 152 Ebl over 6th ST in Montgomery County, Alabama. It was built in 1975, so it is 50 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,415 vehicles a day, roughly 9% of them trucks, projected to reach 15,148 by 2033. The structure is 206 ft (62.8 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Al 152 Ebl over 6th ST built?
It was built in 1975, making it 50 years old in 2025.
What condition is Al 152 Ebl over 6th ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Al 152 Ebl over 6th ST carry?
About 12,415 vehicles per day (2013 count), of which roughly 9% are trucks.
How long is Al 152 Ebl over 6th ST?
The structure is 206 ft (62.8 m) long with a longest span of 61 ft (18.6 m) and a deck 43 ft wide.
Who owns Al 152 Ebl over 6th ST?
It is owned by the State Highway Agency.