US Bridges

Early St. over I65

Fair

Montgomery County, Alabama · 0.5 Mi.N.Of Fairview Ave. · Structure no. 010689

Built
1972
53 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
318 ft
4 main spans
Daily traffic
1,390
2003 count
Owner
State
State Highway Agency

About this bridge

Early St. over I65 is a steel continuous stringer/multi-beam or girder carrying Early St. over I65 in Montgomery County, Alabama. It was built in 1972, so it is 53 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,390 vehicles a day, roughly 1% of them trucks, projected to reach 2,509 by 2028. The structure is 318 ft (96.9 m) long and 64 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesEarly St.
CrossesI65
Location0.5 Mi.N.Of Fairview Ave.
RouteCity Street 0
StateAlabama
Coordinates32.35877, -86.32145
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating46.8 US tons
Inventory rating28.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length318 ft (96.9 m)
Longest span87 ft (26.5 m)
Deck width64 ft (19.5 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,390 (2003)
Projected traffic2,509 by 2028
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$5.1 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Early St. over I65 built?

It was built in 1972, making it 53 years old in 2025.

What condition is Early St. over I65 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Early St. over I65 carry?

About 1,390 vehicles per day (2003 count), of which roughly 1% are trucks.

How long is Early St. over I65?

The structure is 318 ft (96.9 m) long with a longest span of 87 ft (26.5 m) and a deck 64 ft wide.

Who owns Early St. over I65?

It is owned by the State Highway Agency.