US Bridges

Wasden RD over Pintlala Crk Relief

Good

Montgomery County, Alabama · .4 MI N of CO Line · Structure no. 007354

Built
1961
64 years old
Condition
Good
inspected September 2023
Type
Tee Beam
Concrete
Length
204 ft
6 main spans
Daily traffic
650
1993 count
Owner
County
County Highway Agency

About this bridge

Wasden RD over Pintlala Crk Relief is a concrete tee beam carrying Wasden RD over Pintlala Crk Relief in Montgomery County, Alabama. It was built in 1961, so it is 64 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 650 vehicles a day, roughly 1% of them trucks, projected to reach 800 by 2043. The structure is 204 ft (62.2 m) long and 26 ft wide. If it were closed, the detour would be 16.2 mi (26 km).

CarriesWasden RD
CrossesPintlala Crk Relief
Location.4 MI N of CO Line
RouteCounty Highway 13
StateAlabama
Coordinates32.24558, -86.40501
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating40.7 US tons
Inventory rating24.4 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans6
Design loadH 15
Structure length204 ft (62.2 m)
Longest span34 ft (10.4 m)
Deck width26 ft (7.9 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic650 (1993)
Projected traffic800 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed16.2 mi (26 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$1.4 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Wasden RD over Pintlala Crk Relief built?

It was built in 1961, making it 64 years old in 2025.

What condition is Wasden RD over Pintlala Crk Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Wasden RD over Pintlala Crk Relief carry?

About 650 vehicles per day (1993 count), of which roughly 1% are trucks.

How long is Wasden RD over Pintlala Crk Relief?

The structure is 204 ft (62.2 m) long with a longest span of 34 ft (10.4 m) and a deck 26 ft wide.

Who owns Wasden RD over Pintlala Crk Relief?

It is owned by the County Highway Agency.