New US 98/SR 158 over Big Creek
GoodMobile County, Alabama · 0.1 MI E Glenwood RD · Structure no. 018683
- Built
- 2008
- 17 years old, rebuilt 2020
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,717 ft
- 1 main span
- Daily traffic
- 16,939
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
New US 98/SR 158 over Big Creek is a prestressed concrete stringer/multi-beam or girder carrying New US 98/SR 158 over Big Creek in Mobile County, Alabama. It was built in 2008 and reconstructed in 2020, so it is 17 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,939 vehicles a day, roughly 20% of them trucks, projected to reach 27,757 by 2027. The structure is 1,717 ft (523.2 m) long and 43 ft wide. If it were closed, the detour would be 7.5 mi (12 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was New US 98/SR 158 over Big Creek built?
It was built in 2008, making it 17 years old in 2025. It was reconstructed in 2020.
What condition is New US 98/SR 158 over Big Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does New US 98/SR 158 over Big Creek carry?
About 16,939 vehicles per day (2017 count), of which roughly 20% are trucks.
How long is New US 98/SR 158 over Big Creek?
The structure is 1,717 ft (523.2 m) long with a longest span of 125 ft (38.1 m) and a deck 43 ft wide.
Who owns New US 98/SR 158 over Big Creek?
It is owned by the State Highway Agency.