US Bridges

Half Mile RD over E Fork of Fowl River

Fair

Mobile County, Alabama · 1st Drain W of CO RD 59 · Structure no. 017126

Built
1961
64 years old
Condition
Fair
inspected May 2024
Type
Culvert
Concrete
Length
20 ft
2 main spans
Daily traffic
4,474
2024 count
Owner
County
County Highway Agency

About this bridge

Half Mile RD over E Fork of Fowl River is a concrete culvert carrying Half Mile RD over E Fork of Fowl River in Mobile County, Alabama. It was built in 1961, so it is 64 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,474 vehicles a day, roughly 5% of them trucks, projected to reach 6,648 by 2044. The structure is 20 ft (6.2 m) long. If it were closed, the detour would be 8.7 mi (14 km).

CarriesHalf Mile RD
CrossesE Fork of Fowl River
Location1st Drain W of CO RD 59
RouteCounty Highway 0
StateAlabama
Coordinates30.50182, -88.17638
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.5 US tons
Inventory rating26.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length20 ft (6.2 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,474 (2024)
Projected traffic6,648 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$297,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Half Mile RD over E Fork of Fowl River built?

It was built in 1961, making it 64 years old in 2025.

What condition is Half Mile RD over E Fork of Fowl River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does Half Mile RD over E Fork of Fowl River carry?

About 4,474 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Half Mile RD over E Fork of Fowl River?

The structure is 20 ft (6.2 m) long with a longest span of 10 ft (3 m).

Who owns Half Mile RD over E Fork of Fowl River?

It is owned by the County Highway Agency.