I-65 over Bike Trail (former Rr)
FairMobile County, Alabama · 0.7 MI N US 45 · Structure no. 015503
- Built
- 1965
- 60 years old, rebuilt 1992
- Condition
- Fair
- inspected May 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 229 ft
- 4 main spans
- Daily traffic
- 78,895
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-65 over Bike Trail (former Rr) is a concrete continuous tee beam carrying I-65 over Bike Trail (former Rr) in Mobile County, Alabama. It was built in 1965 and reconstructed in 1992, so it is 60 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 78,895 vehicles a day, roughly 11% of them trucks, projected to reach 118,342 by 2042. The structure is 229 ft (69.8 m) long and 161 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-65 over Bike Trail (former Rr) built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1992.
What condition is I-65 over Bike Trail (former Rr) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does I-65 over Bike Trail (former Rr) carry?
About 78,895 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is I-65 over Bike Trail (former Rr)?
The structure is 229 ft (69.8 m) long with a longest span of 63 ft (19.2 m) and a deck 161 ft wide.
Who owns I-65 over Bike Trail (former Rr)?
It is owned by the State Highway Agency.