Baratara Drive over Bayou Baratara
FairMobile County, Alabama · 0.37 MI N Alpine ST · Structure no. 012285
- Built
- 1960
- 65 years old, rebuilt 1980
- Condition
- Fair
- inspected September 2023
- Type
- Channel Beam
- Concrete
- Length
- 74 ft
- 3 main spans
- Daily traffic
- 160
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Baratara Drive over Bayou Baratara is a concrete channel beam carrying Baratara Drive over Bayou Baratara in Mobile County, Alabama. It was built in 1960 and reconstructed in 1980, so it is 65 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 160 vehicles a day, roughly 4% of them trucks, projected to reach 250 by 2042. The structure is 74 ft (22.6 m) long and 39 ft wide. If it were closed, the detour would be 98.2 mi (158 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Baratara Drive over Bayou Baratara built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1980.
What condition is Baratara Drive over Bayou Baratara in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Baratara Drive over Bayou Baratara carry?
About 160 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is Baratara Drive over Bayou Baratara?
The structure is 74 ft (22.6 m) long with a longest span of 24 ft (7.3 m) and a deck 39 ft wide.
Who owns Baratara Drive over Bayou Baratara?
It is owned by the City or Municipal Highway Agency.