US Bridges

E Petain ST over Drainage Ditch

Fair

Mobile County, Alabama · 0.3 MI W Telegraph RD · Structure no. 007711

Built
1962
63 years old
Condition
Fair
inspected January 2024
Type
Culvert
Concrete
Length
28 ft
2 main spans
Daily traffic
250
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

E Petain ST over Drainage Ditch is a concrete culvert carrying E Petain ST over Drainage Ditch in Mobile County, Alabama. It was built in 1962, so it is 63 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 250 vehicles a day, roughly 1% of them trucks, projected to reach 375 by 2044. The structure is 28 ft (8.6 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesE Petain ST
CrossesDrainage Ditch
Location0.3 MI W Telegraph RD
RouteCity Street 0
StateAlabama
Coordinates30.75, -88.08167
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46 US tons
Inventory rating27.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length28 ft (8.6 m)
Longest span10 ft (3 m)
Deck width26 ft (7.8 m)
Roadway width20 ft (6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic250 (2024)
Projected traffic375 by 2044
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$272,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was E Petain ST over Drainage Ditch built?

It was built in 1962, making it 63 years old in 2025.

What condition is E Petain ST over Drainage Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does E Petain ST over Drainage Ditch carry?

About 250 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is E Petain ST over Drainage Ditch?

The structure is 28 ft (8.6 m) long with a longest span of 10 ft (3 m) and a deck 26 ft wide.

Who owns E Petain ST over Drainage Ditch?

It is owned by the City or Municipal Highway Agency.