Michael Blvd over Montlimar Creek
FairMobile County, Alabama · 0.5 MI W I 65 · Structure no. 007080
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected October 2023
- Type
- Tee Beam
- Concrete
- Length
- 170 ft
- 5 main spans
- Daily traffic
- 1,902
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Michael Blvd over Montlimar Creek is a concrete tee beam carrying Michael Blvd over Montlimar Creek in Mobile County, Alabama. It was built in 1960, so it is 65 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,902 vehicles a day, roughly 4% of them trucks, projected to reach 2,853 by 2043. The structure is 170 ft (51.8 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Michael Blvd over Montlimar Creek built?
It was built in 1960, making it 65 years old in 2025.
What condition is Michael Blvd over Montlimar Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Michael Blvd over Montlimar Creek carry?
About 1,902 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is Michael Blvd over Montlimar Creek?
The structure is 170 ft (51.8 m) long with a longest span of 34 ft (10.4 m) and a deck 33 ft wide.
Who owns Michael Blvd over Montlimar Creek?
It is owned by the City or Municipal Highway Agency.