US Bridges

New Home Road over Clear Creek

Good

Marshall County, Alabama · _2857 Ft N JCT 1102 · Structure no. 021074

Built
2018
7 years old
Condition
Good
inspected August 2023
Type
Other
Other
Length
160 ft
1 main span
Daily traffic
138
2018 count
Owner
County
County Highway Agency

About this bridge

New Home Road over Clear Creek is a other other carrying New Home Road over Clear Creek in Marshall County, Alabama. It was built in 2018, so it is 7 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 138 vehicles a day, roughly 2% of them trucks, projected to reach 205 by 2045. The structure is 160 ft (48.8 m) long and 31 ft wide.

CarriesNew Home Road
CrossesClear Creek
Location_2857 Ft N JCT 1102
RouteCounty Highway 106
StateAlabama
Coordinates34.15312, -86.25332
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.7 US tons
Inventory rating44.1 US tons

Structure

Structure typeOther
MaterialOther
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length160 ft (48.8 m)
Longest span80 ft (24.4 m)
Deck width31 ft (9.4 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic138 (2018)
Projected traffic205 by 2045
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.3 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was New Home Road over Clear Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is New Home Road over Clear Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does New Home Road over Clear Creek carry?

About 138 vehicles per day (2018 count), of which roughly 2% are trucks.

How long is New Home Road over Clear Creek?

The structure is 160 ft (48.8 m) long with a longest span of 80 ft (24.4 m) and a deck 31 ft wide.

Who owns New Home Road over Clear Creek?

It is owned by the County Highway Agency.