US Bridges

County HWY 1063 over Slab Creek

Good

Marshall County, Alabama · 8513 Ft S JCT 1064 · Structure no. 019307

Built
2014
11 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
180 ft
3 main spans
Daily traffic
56
2014 count
Owner
County
County Highway Agency

About this bridge

County HWY 1063 over Slab Creek is a prestressed concrete stringer/multi-beam or girder carrying County HWY 1063 over Slab Creek in Marshall County, Alabama. It was built in 2014, so it is 11 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 56 vehicles a day, projected to reach 70 by 2044. The structure is 180 ft (54.9 m) long and 31 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCounty HWY 1063
CrossesSlab Creek
Location8513 Ft S JCT 1064
RouteCounty Highway 63
StateAlabama
Coordinates34.18294, -86.38088
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65 US tons
Inventory rating45.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length180 ft (54.9 m)
Longest span60 ft (18.3 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic56 (2014)
Projected traffic70 by 2044
Trucks0%
Lanes on structure2
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.5 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was County HWY 1063 over Slab Creek built?

It was built in 2014, making it 11 years old in 2025.

What condition is County HWY 1063 over Slab Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does County HWY 1063 over Slab Creek carry?

About 56 vehicles per day (2014 count).

How long is County HWY 1063 over Slab Creek?

The structure is 180 ft (54.9 m) long with a longest span of 60 ft (18.3 m) and a deck 31 ft wide.

Who owns County HWY 1063 over Slab Creek?

It is owned by the County Highway Agency.