US Bridges

Co. Rd. 400 over Turkey Creek

Good

Marshall County, Alabama · 1/2 Mile W SR75 · Structure no. 019176

Built
2017
8 years old
Condition
Good
inspected July 2024
Type
Channel Beam
Concrete
Length
52 ft
1 main span
Daily traffic
92
2017 count
Owner
County
County Highway Agency

About this bridge

Co. Rd. 400 over Turkey Creek is a concrete channel beam carrying Co. Rd. 400 over Turkey Creek in Marshall County, Alabama. It was built in 2017, so it is 8 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 92 vehicles a day, roughly 1% of them trucks, projected to reach 137 by 2044. The structure is 52 ft (15.8 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCo. Rd. 400
CrossesTurkey Creek
Location1/2 Mile W SR75
RouteCounty Highway 400
StateAlabama
Coordinates34.29741, -86.17914
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating82.2 US tons
Inventory rating49.2 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length52 ft (15.8 m)
Longest span50 ft (15.2 m)
Deck width28 ft (8.5 m)
Roadway width19 ft (5.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic92 (2017)
Projected traffic137 by 2044
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$480,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Co. Rd. 400 over Turkey Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is Co. Rd. 400 over Turkey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Co. Rd. 400 over Turkey Creek carry?

About 92 vehicles per day (2017 count), of which roughly 1% are trucks.

How long is Co. Rd. 400 over Turkey Creek?

The structure is 52 ft (15.8 m) long with a longest span of 50 ft (15.2 m) and a deck 28 ft wide.

Who owns Co. Rd. 400 over Turkey Creek?

It is owned by the County Highway Agency.