SR 75 over Slab Creek
FairMarshall County, Alabama · 3.7 MI N JCT SR168 * SR75 · Structure no. 003106
- Built
- 1947
- 78 years old
- Condition
- Fair
- inspected December 2024
- Type
- Tee Beam
- Concrete
- Length
- 170 ft
- 5 main spans
- Daily traffic
- 5,985
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 75 over Slab Creek is a concrete tee beam carrying SR 75 over Slab Creek in Marshall County, Alabama. It was built in 1947, so it is 78 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,985 vehicles a day, roughly 7% of them trucks, projected to reach 8,379 by 2043. The structure is 170 ft (51.8 m) long and 30 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 75 over Slab Creek built?
It was built in 1947, making it 78 years old in 2025.
What condition is SR 75 over Slab Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does SR 75 over Slab Creek carry?
About 5,985 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is SR 75 over Slab Creek?
The structure is 170 ft (51.8 m) long with a longest span of 34 ft (10.4 m) and a deck 30 ft wide.
Who owns SR 75 over Slab Creek?
It is owned by the State Highway Agency.