Toftoy Throughway over Rideout Road
FairPosted for loadMadison County, Alabama · Redstone Arsenal · Structure no. DAPAMCRED000019
- Built
- 1968
- 57 years old, rebuilt 2003
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 190 ft
- 4 main spans
- Daily traffic
- 6,464
- 2016 count
- Owner
- Federal
- Army
About this bridge
Toftoy Throughway over Rideout Road is a steel continuous stringer/multi-beam or girder carrying Toftoy Throughway over Rideout Road in Madison County, Alabama. It was built in 1968 and reconstructed in 2003, so it is 57 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 6,464 vehicles a day, roughly 15% of them trucks, projected to reach 8,000 by 2046. The structure is 190 ft (57.9 m) long and 30 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Toftoy Throughway over Rideout Road built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2003.
What condition is Toftoy Throughway over Rideout Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Toftoy Throughway over Rideout Road carry?
About 6,464 vehicles per day (2016 count), of which roughly 15% are trucks.
How long is Toftoy Throughway over Rideout Road?
The structure is 190 ft (57.9 m) long with a longest span of 54 ft (16.5 m) and a deck 30 ft wide.
Who owns Toftoy Throughway over Rideout Road?
It is owned by the Army.