TA-1 Centerline RD over Indian Creek
FairPosted for loadMadison County, Alabama · 4.0 MI West Patton Road · Structure no. DAPAMCRED000016
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 146 ft
- 3 main spans
- Daily traffic
- 30
- 2016 count
- Owner
- Federal
- Army
About this bridge
TA-1 Centerline RD over Indian Creek is a prestressed concrete box beam or girders - multiple carrying TA-1 Centerline RD over Indian Creek in Madison County, Alabama. It was built in 1992, so it is 33 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 30 vehicles a day, roughly 15% of them trucks, projected to reach 120 by 2046. The structure is 146 ft (44.5 m) long and 19 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TA-1 Centerline RD over Indian Creek built?
It was built in 1992, making it 33 years old in 2025.
What condition is TA-1 Centerline RD over Indian Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does TA-1 Centerline RD over Indian Creek carry?
About 30 vehicles per day (2016 count), of which roughly 15% are trucks.
How long is TA-1 Centerline RD over Indian Creek?
The structure is 146 ft (44.5 m) long with a longest span of 48 ft (14.7 m) and a deck 19 ft wide.
Who owns TA-1 Centerline RD over Indian Creek?
It is owned by the Army.