US Bridges

Short Pike over Short Pike @ Relief Chan

FairPosted for load

Madison County, Alabama · .2 Miles West Wall Triana · Structure no. 019103

Built
1955
70 years old
Condition
Fair
inspected January 2025
Type
Stringer/Multi-beam or Girder
Steel
Length
25 ft
1 main span
Daily traffic
80
2025 count
Owner
City
City or Municipal Highway Agency

About this bridge

Short Pike over Short Pike @ Relief Chan is a steel stringer/multi-beam or girder carrying Short Pike over Short Pike @ Relief Chan in Madison County, Alabama. It was built in 1955, so it is 70 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 80 vehicles a day, projected to reach 105 by 2045. The structure is 25 ft (7.6 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesShort Pike
CrossesShort Pike @ Relief Chan
Location.2 Miles West Wall Triana
RouteCity Street 0
StateAlabama
Coordinates34.66222, -86.75444
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation2: Basically intolerable, requiring high priority of replacement
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating17.4 US tons
Inventory rating10.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length25 ft (7.6 m)
Longest span23 ft (6.9 m)
Deck width29 ft (8.7 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic80 (2025)
Projected traffic105 by 2045
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$298,000 (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Short Pike over Short Pike @ Relief Chan built?

It was built in 1955, making it 70 years old in 2025.

What condition is Short Pike over Short Pike @ Relief Chan in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Short Pike over Short Pike @ Relief Chan carry?

About 80 vehicles per day (2025 count).

How long is Short Pike over Short Pike @ Relief Chan?

The structure is 25 ft (7.6 m) long with a longest span of 23 ft (6.9 m) and a deck 29 ft wide.

Who owns Short Pike over Short Pike @ Relief Chan?

It is owned by the City or Municipal Highway Agency.