US Bridges

Innovation Way over Dry Creek

Fair

Madison County, Alabama · .5 Mile East Pulaski Pike · Structure no. 018760

Built
2002
23 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete
Length
39 ft
3 main spans
Daily traffic
300
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Innovation Way over Dry Creek is a concrete culvert carrying Innovation Way over Dry Creek in Madison County, Alabama. It was built in 2002, so it is 23 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 300 vehicles a day, roughly 1% of them trucks, projected to reach 420 by 2044. The structure is 39 ft (12 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesInnovation Way
CrossesDry Creek
Location.5 Mile East Pulaski Pike
RouteCity Street 0
StateAlabama
Coordinates34.81682, -86.63337
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87 US tons
Inventory rating52.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length39 ft (12 m)
Longest span12 ft (3.7 m)
Deck width40 ft (12.3 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2024)
Projected traffic420 by 2044
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$633,000 (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Innovation Way over Dry Creek built?

It was built in 2002, making it 23 years old in 2025.

What condition is Innovation Way over Dry Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Innovation Way over Dry Creek carry?

About 300 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Innovation Way over Dry Creek?

The structure is 39 ft (12 m) long with a longest span of 12 ft (3.7 m) and a deck 40 ft wide.

Who owns Innovation Way over Dry Creek?

It is owned by the City or Municipal Highway Agency.