US Bridges

I565 to Res Pk Blv over Ramp * I565

Fair

Madison County, Alabama · 7.2 MI N County Line RD · Structure no. 015315

Built
1991
34 years old
Condition
Fair
inspected September 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
527 ft
6 main spans
Daily traffic
11,965
2022 count
Owner
State
State Highway Agency

About this bridge

I565 to Res Pk Blv over Ramp * I565 is a prestressed concrete continuous box beam or girders - single or spread carrying I565 to Res Pk Blv over Ramp * I565 in Madison County, Alabama. It was built in 1991, so it is 34 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,965 vehicles a day, roughly 3% of them trucks, projected to reach 16,751 by 2042. The structure is 527 ft (160.6 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI565 to Res Pk Blv
CrossesRamp * I565
Location7.2 MI N County Line RD
RouteInterstate 565
StateAlabama
Coordinates34.70592, -86.67363
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating64.6 US tons
Inventory rating38.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHL 93
Structure length527 ft (160.6 m)
Longest span109 ft (33.2 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,965 (2022)
Projected traffic16,751 by 2042
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$3.4 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I565 to Res Pk Blv over Ramp * I565 built?

It was built in 1991, making it 34 years old in 2025.

What condition is I565 to Res Pk Blv over Ramp * I565 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does I565 to Res Pk Blv over Ramp * I565 carry?

About 11,965 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is I565 to Res Pk Blv over Ramp * I565?

The structure is 527 ft (160.6 m) long with a longest span of 109 ft (33.2 m) and a deck 28 ft wide.

Who owns I565 to Res Pk Blv over Ramp * I565?

It is owned by the State Highway Agency.