Ready Section RD over Limestone Creek
FairMadison County, Alabama · 0.5 MI E CO RD 1011 · Structure no. 014330
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected April 2024
- Type
- Channel Beam
- Concrete
- Length
- 170 ft
- 5 main spans
- Daily traffic
- 1,080
- 1990 count
- Owner
- County
- County Highway Agency
About this bridge
Ready Section RD over Limestone Creek is a concrete channel beam carrying Ready Section RD over Limestone Creek in Madison County, Alabama. It was built in 1988, so it is 37 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,080 vehicles a day, roughly 1% of them trucks, projected to reach 1,502 by 2036. The structure is 170 ft (51.8 m) long and 32 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ready Section RD over Limestone Creek built?
It was built in 1988, making it 37 years old in 2025.
What condition is Ready Section RD over Limestone Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Ready Section RD over Limestone Creek carry?
About 1,080 vehicles per day (1990 count), of which roughly 1% are trucks.
How long is Ready Section RD over Limestone Creek?
The structure is 170 ft (51.8 m) long with a longest span of 34 ft (10.4 m) and a deck 32 ft wide.
Who owns Ready Section RD over Limestone Creek?
It is owned by the County Highway Agency.