US Bridges

I-85 N.B.L. over Al 199

Fair

Macon County, Alabama · I-85 over AL.199 · Structure no. 008209

Built
1964
61 years old
Condition
Fair
inspected May 2023
Type
Tee Beam
Concrete Continuous
Length
311 ft
5 main spans
Daily traffic
15,625
2013 count
Owner
State
State Highway Agency

About this bridge

I-85 N.B.L. over Al 199 is a concrete continuous tee beam carrying I-85 N.B.L. over Al 199 in Macon County, Alabama. It was built in 1964, so it is 61 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15,625 vehicles a day, roughly 26% of them trucks, projected to reach 20,593 by 2033. The structure is 311 ft (94.8 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-85 N.B.L.
CrossesAl 199
LocationI-85 over AL.199
RouteInterstate 85
StateAlabama
Coordinates32.47, -85.70167
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment7: Better than present minimum criteria
Operating rating44.4 US tons
Inventory rating26.6 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length311 ft (94.8 m)
Longest span80 ft (24.4 m)
Deck width33 ft (10.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,625 (2013)
Projected traffic20,593 by 2033
Trucks26%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$2.6 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-85 N.B.L. over Al 199 built?

It was built in 1964, making it 61 years old in 2025.

What condition is I-85 N.B.L. over Al 199 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does I-85 N.B.L. over Al 199 carry?

About 15,625 vehicles per day (2013 count), of which roughly 26% are trucks.

How long is I-85 N.B.L. over Al 199?

The structure is 311 ft (94.8 m) long with a longest span of 80 ft (24.4 m) and a deck 33 ft wide.

Who owns I-85 N.B.L. over Al 199?

It is owned by the State Highway Agency.