Nick Davis Road over Swan Creek (relief)
GoodLimestone County, Alabama · .3 Mi. E. US 31 · Structure no. 021376
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 180 ft
- 3 main spans
- Daily traffic
- 9,160
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Nick Davis Road over Swan Creek (relief) is a prestressed concrete stringer/multi-beam or girder carrying Nick Davis Road over Swan Creek (relief) in Limestone County, Alabama. It was built in 2020, so it is 5 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,160 vehicles a day, roughly 10% of them trucks, projected to reach 21,912 by 2040. The structure is 180 ft (54.9 m) long and 39 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nick Davis Road over Swan Creek (relief) built?
It was built in 2020, making it 5 years old in 2025.
What condition is Nick Davis Road over Swan Creek (relief) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Nick Davis Road over Swan Creek (relief) carry?
About 9,160 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Nick Davis Road over Swan Creek (relief)?
The structure is 180 ft (54.9 m) long with a longest span of 60 ft (18.3 m) and a deck 39 ft wide.
Who owns Nick Davis Road over Swan Creek (relief)?
It is owned by the City or Municipal Highway Agency.