US Bridges

Shaw Road over Poplar CR

Fair

Limestone County, Alabama · SEC12 T3S R6W · Structure no. 006985

Built
1960
65 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
32 ft
2 main spans
Daily traffic
675
2014 count
Owner
County
County Highway Agency

About this bridge

Shaw Road over Poplar CR is a steel stringer/multi-beam or girder carrying Shaw Road over Poplar CR in Limestone County, Alabama. It was built in 1960, so it is 65 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 675 vehicles a day, roughly 1% of them trucks, projected to reach 1,000 by 2034. The structure is 32 ft (9.8 m) long and 23 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesShaw Road
CrossesPoplar CR
LocationSEC12 T3S R6W
RouteCounty Highway 25
StateAlabama
Coordinates34.79925, -87.12479
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating55.9 US tons
Inventory rating39.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length32 ft (9.8 m)
Longest span15 ft (4.6 m)
Deck width23 ft (7.1 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic675 (2014)
Projected traffic1,000 by 2034
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$287,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Shaw Road over Poplar CR built?

It was built in 1960, making it 65 years old in 2025.

What condition is Shaw Road over Poplar CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Shaw Road over Poplar CR carry?

About 675 vehicles per day (2014 count), of which roughly 1% are trucks.

How long is Shaw Road over Poplar CR?

The structure is 32 ft (9.8 m) long with a longest span of 15 ft (4.6 m) and a deck 23 ft wide.

Who owns Shaw Road over Poplar CR?

It is owned by the County Highway Agency.