US Bridges

25th ST So. over Shades Creek

Fair

Jefferson County, Alabama · US 78 * 25th ST So. · Structure no. 010763

Built
1972
53 years old
Condition
Fair
inspected July 2024
Type
Culvert
Concrete
Length
50 ft
5 main spans
Daily traffic
2,500
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

25th ST So. over Shades Creek is a concrete culvert carrying 25th ST So. over Shades Creek in Jefferson County, Alabama. It was built in 1972, so it is 53 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,500 vehicles a day, roughly 5% of them trucks, projected to reach 3,500 by 2044. The structure is 50 ft (15.2 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries25th ST So.
CrossesShades Creek
LocationUS 78 * 25th ST So.
RouteCity Street 0
StateAlabama
Coordinates33.55833, -86.68333
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.9 US tons
Inventory rating32.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadH 15
Structure length50 ft (15.2 m)
Longest span10 ft (3 m)
Deck width51 ft (15.4 m)
Roadway width49 ft (14.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,500 (2024)
Projected traffic3,500 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$560,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was 25th ST So. over Shades Creek built?

It was built in 1972, making it 53 years old in 2025.

What condition is 25th ST So. over Shades Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does 25th ST So. over Shades Creek carry?

About 2,500 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is 25th ST So. over Shades Creek?

The structure is 50 ft (15.2 m) long with a longest span of 10 ft (3 m) and a deck 51 ft wide.

Who owns 25th ST So. over Shades Creek?

It is owned by the City or Municipal Highway Agency.