Al- 38 West over Ponciana DR
FairJefferson County, Alabama · US 280 * Ponciana DR · Structure no. 010033
- Built
- 1969
- 56 years old, rebuilt 1995
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 180 ft
- 4 main spans
- Daily traffic
- 33,275
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Al- 38 West over Ponciana DR is a steel stringer/multi-beam or girder carrying Al- 38 West over Ponciana DR in Jefferson County, Alabama. It was built in 1969 and reconstructed in 1995, so it is 56 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 33,275 vehicles a day, roughly 6% of them trucks, projected to reach 43,768 by 2042. The structure is 180 ft (54.9 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Al- 38 West over Ponciana DR built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 1995.
What condition is Al- 38 West over Ponciana DR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Al- 38 West over Ponciana DR carry?
About 33,275 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is Al- 38 West over Ponciana DR?
The structure is 180 ft (54.9 m) long with a longest span of 50 ft (15.2 m) and a deck 70 ft wide.
Who owns Al- 38 West over Ponciana DR?
It is owned by the State Highway Agency.