US Bridges

I - 20/59 North over 3rd ST North

Fair

Jefferson County, Alabama · .1 Mi. So. Rt. Interchang · Structure no. 009871

Built
1969
56 years old, rebuilt 2003
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
474 ft
7 main spans
Daily traffic
78,675
2024 count
Owner
State
State Highway Agency

About this bridge

I - 20/59 North over 3rd ST North is a steel stringer/multi-beam or girder carrying I - 20/59 North over 3rd ST North in Jefferson County, Alabama. It was built in 1969 and reconstructed in 2003, so it is 56 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 78,675 vehicles a day, roughly 10% of them trucks, projected to reach 84,124 by 2044. The structure is 474 ft (144.5 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI - 20/59 North
Crosses3rd ST North
Location.1 Mi. So. Rt. Interchang
RouteInterstate 20
StateAlabama
Coordinates33.5198, -86.8318
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.5 US tons
Inventory rating35.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length474 ft (144.5 m)
Longest span72 ft (21.9 m)
Deck width70 ft (21.2 m)
Roadway width65 ft (19.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic78,675 (2024)
Projected traffic84,124 by 2044
Trucks10%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$7.9 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I - 20/59 North over 3rd ST North built?

It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2003.

What condition is I - 20/59 North over 3rd ST North in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does I - 20/59 North over 3rd ST North carry?

About 78,675 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is I - 20/59 North over 3rd ST North?

The structure is 474 ft (144.5 m) long with a longest span of 72 ft (21.9 m) and a deck 70 ft wide.

Who owns I - 20/59 North over 3rd ST North?

It is owned by the State Highway Agency.