CR 75 over Ditch
GoodJackson County, Alabama · 1 MI N Stevenson · Structure no. 016302
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected March 2023
- Type
- Culvert
- Concrete
- Length
- 21 ft
- 2 main spans
- Daily traffic
- 520
- 1997 count
- Owner
- County
- County Highway Agency
About this bridge
CR 75 over Ditch is a concrete culvert carrying CR 75 over Ditch in Jackson County, Alabama. It was built in 1997, so it is 28 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 520 vehicles a day, roughly 10% of them trucks, projected to reach 725 by 2039. The structure is 21 ft (6.3 m) long. If it were closed, the detour would be 16.2 mi (26 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 75 over Ditch built?
It was built in 1997, making it 28 years old in 2025.
What condition is CR 75 over Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does CR 75 over Ditch carry?
About 520 vehicles per day (1997 count), of which roughly 10% are trucks.
How long is CR 75 over Ditch?
The structure is 21 ft (6.3 m) long with a longest span of 10 ft (3 m).
Who owns CR 75 over Ditch?