US Bridges

CO RD 75 over Bruners Gin Creek

Fair

Houston County, Alabama · CO RD 33 to CO RD 81 · Structure no. 008035

Built
1963
62 years old
Condition
Fair
inspected September 2023
Type
Culvert
Concrete
Length
37 ft
3 main spans
Daily traffic
330
1993 count
Owner
County
County Highway Agency

About this bridge

CO RD 75 over Bruners Gin Creek is a concrete culvert carrying CO RD 75 over Bruners Gin Creek in Houston County, Alabama. It was built in 1963, so it is 62 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 330 vehicles a day, roughly 7% of them trucks, projected to reach 600 by 2033. The structure is 37 ft (11.4 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCO RD 75
CrossesBruners Gin Creek
LocationCO RD 33 to CO RD 81
RouteCounty Highway 75
StateAlabama
Coordinates31.06749, -85.18364
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating46.1 US tons
Inventory rating27.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length37 ft (11.4 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic330 (1993)
Projected traffic600 by 2033
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$415,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was CO RD 75 over Bruners Gin Creek built?

It was built in 1963, making it 62 years old in 2025.

What condition is CO RD 75 over Bruners Gin Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does CO RD 75 over Bruners Gin Creek carry?

About 330 vehicles per day (1993 count), of which roughly 7% are trucks.

How long is CO RD 75 over Bruners Gin Creek?

The structure is 37 ft (11.4 m) long with a longest span of 12 ft (3.7 m).

Who owns CO RD 75 over Bruners Gin Creek?

It is owned by the County Highway Agency.