SR 10 MP 210.854 over Choctawhatchee R. Relief
GoodHenry County, Alabama · 4.6 Mi.E. SR 105 · Structure no. 014842
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 328 ft
- 8 main spans
- Daily traffic
- 1,710
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
SR 10 MP 210.854 over Choctawhatchee R. Relief is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 10 MP 210.854 over Choctawhatchee R. Relief in Henry County, Alabama. It was built in 1989, so it is 36 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,710 vehicles a day, roughly 15% of them trucks, projected to reach 2,214 by 2033. The structure is 328 ft (100 m) long and 43 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 10 MP 210.854 over Choctawhatchee R. Relief built?
It was built in 1989, making it 36 years old in 2025.
What condition is SR 10 MP 210.854 over Choctawhatchee R. Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does SR 10 MP 210.854 over Choctawhatchee R. Relief carry?
About 1,710 vehicles per day (2013 count), of which roughly 15% are trucks.
How long is SR 10 MP 210.854 over Choctawhatchee R. Relief?
The structure is 328 ft (100 m) long with a longest span of 41 ft (12.5 m) and a deck 43 ft wide.
Who owns SR 10 MP 210.854 over Choctawhatchee R. Relief?
It is owned by the State Highway Agency.