SR 95 MP 42.060 over Abbie Creek North Fork
GoodHenry County, Alabama · 1.9 Mi. S. of Abbeville · Structure no. 013361
- Built
- 1984
- 41 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 246 ft
- 6 main spans
- Daily traffic
- 1,020
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
SR 95 MP 42.060 over Abbie Creek North Fork is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 95 MP 42.060 over Abbie Creek North Fork in Henry County, Alabama. It was built in 1984, so it is 41 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,020 vehicles a day, roughly 14% of them trucks, projected to reach 1,412 by 2033. The structure is 246 ft (75 m) long and 43 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 95 MP 42.060 over Abbie Creek North Fork built?
It was built in 1984, making it 41 years old in 2025.
What condition is SR 95 MP 42.060 over Abbie Creek North Fork in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does SR 95 MP 42.060 over Abbie Creek North Fork carry?
About 1,020 vehicles per day (2013 count), of which roughly 14% are trucks.
How long is SR 95 MP 42.060 over Abbie Creek North Fork?
The structure is 246 ft (75 m) long with a longest span of 41 ft (12.5 m) and a deck 43 ft wide.
Who owns SR 95 MP 42.060 over Abbie Creek North Fork?
It is owned by the State Highway Agency.