CO RD 72 over Taylor Creek Relief
GoodGreene County, Alabama · 1.3 MI N Bragsville · Structure no. 015868
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected February 2024
- Type
- Channel Beam
- Concrete
- Length
- 48 ft
- 2 main spans
- Daily traffic
- 305
- 1991 count
- Owner
- County
- County Highway Agency
About this bridge
CO RD 72 over Taylor Creek Relief is a concrete channel beam carrying CO RD 72 over Taylor Creek Relief in Greene County, Alabama. It was built in 1993, so it is 32 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 305 vehicles a day, roughly 31% of them trucks, projected to reach 366 by 2031. The structure is 48 ft (14.6 m) long and 25 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO RD 72 over Taylor Creek Relief built?
It was built in 1993, making it 32 years old in 2025.
What condition is CO RD 72 over Taylor Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does CO RD 72 over Taylor Creek Relief carry?
About 305 vehicles per day (1991 count), of which roughly 31% are trucks.
How long is CO RD 72 over Taylor Creek Relief?
The structure is 48 ft (14.6 m) long with a longest span of 24 ft (7.3 m) and a deck 25 ft wide.
Who owns CO RD 72 over Taylor Creek Relief?
It is owned by the County Highway Agency.