CO RD 80 over Relief Ditch to Mud Ck
FairFranklin County, Alabama · 2.9 MI W CO 80 CO 90 JCT · Structure no. 005994
- Built
- 1957
- 68 years old
- Condition
- Fair
- inspected November 2023
- Type
- Channel Beam
- Concrete
- Length
- 68 ft
- 4 main spans
- Daily traffic
- 330
- 1986 count
- Owner
- County
- County Highway Agency
About this bridge
CO RD 80 over Relief Ditch to Mud Ck is a concrete channel beam carrying CO RD 80 over Relief Ditch to Mud Ck in Franklin County, Alabama. It was built in 1957, so it is 68 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 330 vehicles a day, roughly 3% of them trucks, projected to reach 824 by 2032. The structure is 68 ft (20.7 m) long and 26 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO RD 80 over Relief Ditch to Mud Ck built?
It was built in 1957, making it 68 years old in 2025.
What condition is CO RD 80 over Relief Ditch to Mud Ck in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does CO RD 80 over Relief Ditch to Mud Ck carry?
About 330 vehicles per day (1986 count), of which roughly 3% are trucks.
How long is CO RD 80 over Relief Ditch to Mud Ck?
The structure is 68 ft (20.7 m) long with a longest span of 17 ft (5.2 m) and a deck 26 ft wide.
Who owns CO RD 80 over Relief Ditch to Mud Ck?
It is owned by the County Highway Agency.