Calvin Fowler Road over Stewart Creek
FairPosted for loadFayette County, Alabama · East of CR97 SR171 JCT · Structure no. 021343
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 42 ft
- 1 main span
- Daily traffic
- 40
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Calvin Fowler Road over Stewart Creek is a steel stringer/multi-beam or girder carrying Calvin Fowler Road over Stewart Creek in Fayette County, Alabama. It was built in 1975, so it is 50 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 40 vehicles a day, projected to reach 60 by 2037. The structure is 42 ft (12.8 m) long and 14 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Calvin Fowler Road over Stewart Creek built?
It was built in 1975, making it 50 years old in 2025.
What condition is Calvin Fowler Road over Stewart Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Calvin Fowler Road over Stewart Creek carry?
About 40 vehicles per day (2017 count).
How long is Calvin Fowler Road over Stewart Creek?
The structure is 42 ft (12.8 m) long with a longest span of 42 ft (12.8 m) and a deck 14 ft wide.
Who owns Calvin Fowler Road over Stewart Creek?
It is owned by the County Highway Agency.