US Bridges

Sand Valley Rd. over Fisher Creek

Good

Etowah County, Alabama · 0.3 Miles So Cox Chapel · Structure no. 017138

Built
1998
27 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete
Length
45 ft
3 main spans
Daily traffic
480
1997 count
Owner
County
County Highway Agency

About this bridge

Sand Valley Rd. over Fisher Creek is a concrete culvert carrying Sand Valley Rd. over Fisher Creek in Etowah County, Alabama. It was built in 1998, so it is 27 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 480 vehicles a day, roughly 2% of them trucks, projected to reach 687 by 2032. The structure is 45 ft (13.7 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesSand Valley Rd.
CrossesFisher Creek
Location0.3 Miles So Cox Chapel
RouteCounty Highway 338
StateAlabama
Coordinates34.07194, -86.11715
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating79.5 US tons
Inventory rating47.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length45 ft (13.7 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic480 (1997)
Projected traffic687 by 2032
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$570,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Sand Valley Rd. over Fisher Creek built?

It was built in 1998, making it 27 years old in 2025.

What condition is Sand Valley Rd. over Fisher Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Sand Valley Rd. over Fisher Creek carry?

About 480 vehicles per day (1997 count), of which roughly 2% are trucks.

How long is Sand Valley Rd. over Fisher Creek?

The structure is 45 ft (13.7 m) long with a longest span of 14 ft (4.3 m).

Who owns Sand Valley Rd. over Fisher Creek?

It is owned by the County Highway Agency.