US Bridges

US 411 New Align over Branch

Good

Etowah County, Alabama · 0.1 MI S Spring Ave · Structure no. 016876

Built
2023
2 years old
Condition
Good
inspected January 2024
Type
Culvert
Concrete
Length
27 ft
3 main spans
Daily traffic
8,488
2022 count
Owner
State
State Highway Agency

About this bridge

US 411 New Align over Branch is a concrete culvert carrying US 411 New Align over Branch in Etowah County, Alabama. It was built in 2023, so it is 2 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,488 vehicles a day, roughly 14% of them trucks, projected to reach 11,883 by 2042. The structure is 27 ft (8.2 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesUS 411 New Align
CrossesBranch
Location0.1 MI S Spring Ave
RouteU.S. Route 0
StateAlabama
Coordinates34.12078, -85.84816
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98 US tons
Inventory rating98 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length27 ft (8.2 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic8,488 (2022)
Projected traffic11,883 by 2042
Trucks14%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$2.6 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was US 411 New Align over Branch built?

It was built in 2023, making it 2 years old in 2025.

What condition is US 411 New Align over Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does US 411 New Align over Branch carry?

About 8,488 vehicles per day (2022 count), of which roughly 14% are trucks.

How long is US 411 New Align over Branch?

The structure is 27 ft (8.2 m) long with a longest span of 8 ft (2.4 m).

Who owns US 411 New Align over Branch?

It is owned by the State Highway Agency.