US Bridges

Fieldcrest Road over Welona Creek

Fair

Elmore County, Alabama · Sec 34 T21N R17E · Structure no. 011810

Built
1977
48 years old
Condition
Fair
inspected April 2023
Type
Channel Beam
Concrete
Length
57 ft
3 main spans
Daily traffic
60
1998 count
Owner
County
County Highway Agency

About this bridge

Fieldcrest Road over Welona Creek is a concrete channel beam carrying Fieldcrest Road over Welona Creek in Elmore County, Alabama. It was built in 1977, so it is 48 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 60 vehicles a day, projected to reach 80 by 2030. The structure is 57 ft (17.4 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesFieldcrest Road
CrossesWelona Creek
LocationSec 34 T21N R17E
RouteCounty Highway 27
StateAlabama
Coordinates32.75333, -86.32833
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating60.5 US tons
Inventory rating36.2 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadH 15
Structure length57 ft (17.4 m)
Longest span17 ft (5.2 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (1998)
Projected traffic80 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$497,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Fieldcrest Road over Welona Creek built?

It was built in 1977, making it 48 years old in 2025.

What condition is Fieldcrest Road over Welona Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Fieldcrest Road over Welona Creek carry?

About 60 vehicles per day (1998 count).

How long is Fieldcrest Road over Welona Creek?

The structure is 57 ft (17.4 m) long with a longest span of 17 ft (5.2 m) and a deck 28 ft wide.

Who owns Fieldcrest Road over Welona Creek?

It is owned by the County Highway Agency.