CO Rt 270 over Bear Creek
FairPosted for loadDeKalb County, Alabama · 1.2 MI E CO Rt 127T7SR9E · Structure no. 011842
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected December 2023
- Type
- Channel Beam
- Concrete
- Length
- 67 ft
- 3 main spans
- Daily traffic
- 213
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CO Rt 270 over Bear Creek is a concrete channel beam carrying CO Rt 270 over Bear Creek in DeKalb County, Alabama. It was built in 1977, so it is 48 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 213 vehicles a day, roughly 4% of them trucks, projected to reach 317 by 2043. The structure is 67 ft (20.4 m) long and 25 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO Rt 270 over Bear Creek built?
It was built in 1977, making it 48 years old in 2025.
What condition is CO Rt 270 over Bear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does CO Rt 270 over Bear Creek carry?
About 213 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is CO Rt 270 over Bear Creek?
The structure is 67 ft (20.4 m) long with a longest span of 24 ft (7.3 m) and a deck 25 ft wide.
Who owns CO Rt 270 over Bear Creek?
It is owned by the County Highway Agency.