CO RD 72 over Piney Creek
FairPosted for loadDeKalb County, Alabama · 1.0 MI W Al 75 T6SR7E · Structure no. 008392
- Built
- 1964
- 61 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 31 ft
- 1 main span
- Daily traffic
- 551
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CO RD 72 over Piney Creek is a steel stringer/multi-beam or girder carrying CO RD 72 over Piney Creek in DeKalb County, Alabama. It was built in 1964, so it is 61 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 551 vehicles a day, roughly 4% of them trucks, projected to reach 819 by 2043. The structure is 31 ft (9.4 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO RD 72 over Piney Creek built?
It was built in 1964, making it 61 years old in 2025.
What condition is CO RD 72 over Piney Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does CO RD 72 over Piney Creek carry?
About 551 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is CO RD 72 over Piney Creek?
The structure is 31 ft (9.4 m) long with a longest span of 31 ft (9.4 m) and a deck 24 ft wide.
Who owns CO RD 72 over Piney Creek?
It is owned by the County Highway Agency.