US 80 Ebl over Cahaba River RELIEFNO.2
FairDallas County, Alabama · 5.2 Mi.W.Of Al 219 · Structure no. 012755
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 204 ft
- 6 main spans
- Daily traffic
- 2,450
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
US 80 Ebl over Cahaba River RELIEFNO.2 is a prestressed concrete continuous stringer/multi-beam or girder carrying US 80 Ebl over Cahaba River RELIEFNO.2 in Dallas County, Alabama. It was built in 1982, so it is 43 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,450 vehicles a day, roughly 26% of them trucks, projected to reach 3,203 by 2033. The structure is 204 ft (62.2 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 80 Ebl over Cahaba River RELIEFNO.2 built?
It was built in 1982, making it 43 years old in 2025.
What condition is US 80 Ebl over Cahaba River RELIEFNO.2 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does US 80 Ebl over Cahaba River RELIEFNO.2 carry?
About 2,450 vehicles per day (2013 count), of which roughly 26% are trucks.
How long is US 80 Ebl over Cahaba River RELIEFNO.2?
The structure is 204 ft (62.2 m) long with a longest span of 34 ft (10.4 m) and a deck 43 ft wide.
Who owns US 80 Ebl over Cahaba River RELIEFNO.2?
It is owned by the State Highway Agency.