SR 27 MP 38.326 over Branch Relief
GoodDale County, Alabama · 1.7 Mi.N.Coffee Line · Structure no. 000645
- Built
- 1929
- 96 years old, rebuilt 2001
- Condition
- Good
- inspected September 2024
- Type
- Culvert
- Concrete
- Length
- 25 ft
- 3 main spans
- Daily traffic
- 2,710
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
SR 27 MP 38.326 over Branch Relief is a concrete culvert carrying SR 27 MP 38.326 over Branch Relief in Dale County, Alabama. It was built in 1929 and reconstructed in 2001, so it is 96 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,710 vehicles a day, roughly 11% of them trucks, projected to reach 3,933 by 2033. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 18 mi (29 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 27 MP 38.326 over Branch Relief built?
It was built in 1929, making it 96 years old in 2025. It was reconstructed in 2001.
What condition is SR 27 MP 38.326 over Branch Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does SR 27 MP 38.326 over Branch Relief carry?
About 2,710 vehicles per day (2013 count), of which roughly 11% are trucks.
How long is SR 27 MP 38.326 over Branch Relief?
The structure is 25 ft (7.6 m) long with a longest span of 8 ft (2.4 m).
Who owns SR 27 MP 38.326 over Branch Relief?
It is owned by the State Highway Agency.