US 278; SR74 over Mulberry Fk Warrior R
GoodCullman County, Alabama · 3 MI E JCT SR 91 * US 278 · Structure no. 017161
- Built
- 2000
- 25 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 407 ft
- 4 main spans
- Daily traffic
- 6,028
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 278; SR74 over Mulberry Fk Warrior R is a prestressed concrete stringer/multi-beam or girder carrying US 278; SR74 over Mulberry Fk Warrior R in Cullman County, Alabama. It was built in 2000, so it is 25 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,028 vehicles a day, roughly 14% of them trucks, projected to reach 8,440 by 2043. The structure is 407 ft (124 m) long and 42 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 278; SR74 over Mulberry Fk Warrior R built?
It was built in 2000, making it 25 years old in 2025.
What condition is US 278; SR74 over Mulberry Fk Warrior R in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does US 278; SR74 over Mulberry Fk Warrior R carry?
About 6,028 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is US 278; SR74 over Mulberry Fk Warrior R?
The structure is 407 ft (124 m) long with a longest span of 101 ft (30.7 m) and a deck 42 ft wide.
Who owns US 278; SR74 over Mulberry Fk Warrior R?
It is owned by the State Highway Agency.