US Bridges

US 84 MP 128.574 over Conecuh River

Good

Covington County, Alabama · 1 MI W. of Andalusia · Structure no. 015762

Built
1993
32 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
735 ft
1 main span
Daily traffic
10,280
2013 count
Owner
State
State Highway Agency

About this bridge

US 84 MP 128.574 over Conecuh River is a prestressed concrete stringer/multi-beam or girder carrying US 84 MP 128.574 over Conecuh River in Covington County, Alabama. It was built in 1993, so it is 32 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,280 vehicles a day, roughly 10% of them trucks, projected to reach 13,791 by 2033. The structure is 735 ft (224 m) long and 80 ft wide. If it were closed, the detour would be 14.3 mi (23 km).

CarriesUS 84 MP 128.574
CrossesConecuh River
Location1 MI W. of Andalusia
RouteU.S. Route 84
StateAlabama
Coordinates31.34838, -86.53093
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.2 US tons
Inventory rating39 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+6 approach)
Design loadHS 20
Structure length735 ft (224 m)
Longest span140 ft (42.7 m)
Deck width80 ft (24.5 m)
Roadway width78 ft (23.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,280 (2013)
Projected traffic13,791 by 2033
Trucks10%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.3 mi (23 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$13.5 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was US 84 MP 128.574 over Conecuh River built?

It was built in 1993, making it 32 years old in 2025.

What condition is US 84 MP 128.574 over Conecuh River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does US 84 MP 128.574 over Conecuh River carry?

About 10,280 vehicles per day (2013 count), of which roughly 10% are trucks.

How long is US 84 MP 128.574 over Conecuh River?

The structure is 735 ft (224 m) long with a longest span of 140 ft (42.7 m) and a deck 80 ft wide.

Who owns US 84 MP 128.574 over Conecuh River?

It is owned by the State Highway Agency.