Sr. 134 MP 8.121 over Pea River Relief
GoodCoffee County, Alabama · 3 Mi.E.Of SR.189 · Structure no. 017834
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 495 ft
- 11 main spans
- Daily traffic
- 3,940
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
Sr. 134 MP 8.121 over Pea River Relief is a prestressed concrete stringer/multi-beam or girder carrying Sr. 134 MP 8.121 over Pea River Relief in Coffee County, Alabama. It was built in 2003, so it is 22 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,940 vehicles a day, roughly 10% of them trucks, projected to reach 5,674 by 2033. The structure is 495 ft (150.9 m) long and 46 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sr. 134 MP 8.121 over Pea River Relief built?
It was built in 2003, making it 22 years old in 2025.
What condition is Sr. 134 MP 8.121 over Pea River Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Sr. 134 MP 8.121 over Pea River Relief carry?
About 3,940 vehicles per day (2013 count), of which roughly 10% are trucks.
How long is Sr. 134 MP 8.121 over Pea River Relief?
The structure is 495 ft (150.9 m) long with a longest span of 45 ft (13.7 m) and a deck 46 ft wide.
Who owns Sr. 134 MP 8.121 over Pea River Relief?
It is owned by the State Highway Agency.