US Bridges

Clolinger Road over Stream

Fair

Clarke County, Alabama · 200 East of Industrial · Structure no. 021232

Built
2020
5 years old
Condition
Fair
inspected January 2025
Type
Channel Beam
Concrete
Length
68 ft
2 main spans
Daily traffic
861
2025 count
Owner
City
City or Municipal Highway Agency

About this bridge

Clolinger Road over Stream is a concrete channel beam carrying Clolinger Road over Stream in Clarke County, Alabama. It was built in 2020, so it is 5 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 861 vehicles a day, roughly 50% of them trucks, projected to reach 1,162 by 2045. The structure is 68 ft (20.7 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesClolinger Road
CrossesStream
Location200 East of Industrial
RouteCity Street 0
StateAlabama
Coordinates31.51039, -87.87682
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85.3 US tons
Inventory rating51.1 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length68 ft (20.7 m)
Longest span34 ft (10.4 m)
Deck width33 ft (10 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic861 (2025)
Projected traffic1,162 by 2045
Trucks50%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$685,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Clolinger Road over Stream built?

It was built in 2020, making it 5 years old in 2025.

What condition is Clolinger Road over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Clolinger Road over Stream carry?

About 861 vehicles per day (2025 count), of which roughly 50% are trucks.

How long is Clolinger Road over Stream?

The structure is 68 ft (20.7 m) long with a longest span of 34 ft (10.4 m) and a deck 33 ft wide.

Who owns Clolinger Road over Stream?

It is owned by the City or Municipal Highway Agency.