Airport Road over Walnut Creek
FairPosted for loadChilton County, Alabama · 0.2 MI SE of Airport · Structure no. 007650
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected March 2023
- Type
- Tee Beam
- Concrete
- Length
- 340 ft
- 10 main spans
- Daily traffic
- 7,100
- 2007 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Airport Road over Walnut Creek is a concrete tee beam carrying Airport Road over Walnut Creek in Chilton County, Alabama. It was built in 1962, so it is 63 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 7,100 vehicles a day, roughly 10% of them trucks, projected to reach 15,215 by 2043. The structure is 340 ft (103.6 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Airport Road over Walnut Creek built?
It was built in 1962, making it 63 years old in 2025.
What condition is Airport Road over Walnut Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Airport Road over Walnut Creek carry?
About 7,100 vehicles per day (2007 count), of which roughly 10% are trucks.
How long is Airport Road over Walnut Creek?
The structure is 340 ft (103.6 m) long with a longest span of 34 ft (10.4 m) and a deck 24 ft wide.
Who owns Airport Road over Walnut Creek?
It is owned by the City or Municipal Highway Agency.